slideshow slideshow
Business Area
Business Area
Business Performance
Equipment Status
Customer Center
+82-55-262-3067
saehan60@hanmail.net
FAX : +82-55-262-3097

Business Performance

Business Area  Business Area
Subject S-OIL R2R FGC MODIFICATION
Date 2015-06-17

 

¢º END USER : S-OIL / DOOSAN CO., LTD.

¢º Construction Period : October. 2009 ~ July. 2010

¢º - S/H Tube BY-Pass Link Installation

    - E/P ECONO. Module Installation

    - ECONO. Trailing end Duct Reconfiguration

    - Buck-Stay Structure Change for the Boiler Vibration Reduction

    - Installation of steel Structures for the Boiler Easy Check

    - The Detail Design and Equipment Make, Installation

 

 


 

File